How to lay Block paving.

Block paving needs to be surrounded by something to give a firm edge. The edges of any paving are the most vulnerable and we recommend either working with laying edging stones or laying an edge of the paving blocks you are using.

Once you have set out the area to be paved and made sure the levels you are laying to will drain water away from the house ( Please note any paving near the house should be at least 150mm down from the DPC) You need to remove any surplus soil or concrete which could affect the levels. Scalpings are very much easier to work with and should be laid to a bed of between 100 and 150mm. 

 Once the scalpings are in and compacted  A layer of sharp sand should be placed.

Once the sand is in, its a great idea to vibrate this before laying the paving bricks. Lumps can form in the sand and these can go unnoticed until compacting the pathway when the lumps may burst and a brick or two may immediately drop into the void created. Scrape the sand back to get it level using a screeding timber you can make up easily.

 

Once the sand is laid the bricks can be laid across it. Make sure you press them up together as closely as possible and bed them down gently in the sand. As with a brick wall, the bricks should be laid so that the joints overlap. This will leave cuts which can be dropped in later. The best way to do the cuts if there are a small amount as above, is with a disk cutter.  Larger areas produce more cuts and its easier to cut them with a proprietary cutter, or splitter as its called.

Don't attempt to rush this job, each brick has a small spacing burr or two on each side to give a little joint between them so make sure you lay them square and if any brick feels like it hasn't gone down properly, on soft sand, it may be there is a lump of gravel or something in the way so take the brick out and check. You will be vibrating these bricks down soon so its important they all sit on the bed properly

 

When the path is laid and cuts complete you need to cover it with silver (playpit) sand and brush the sand into all the joints. Don't rush this either it is this sand which binds the whole lot together and will stop bricks moving once traffic starts to use the path or driveway.

  

When you have brushed in as much sand as possible, run the vibrating plate over the path for 10 minutes. Make sure you have covered every square inch and do not dwell in one place for too long. Do not clean all surplus sand off path before vibrating. After 10 minutes, tip some more silver sand over and start brushing in again, then vibrate again. Continue with this until you are sure every single joint is full.


 

 
Sandstones Services offer a wide range of professional general building services and have built an excellent reputation for providing a high quality service.

Teak Furniture

With an average lifespan of 75 years, teak wood has long been commended as the ideal choice for outdoor furniture. It has qualities unlike any other wood in its ability to withstand the rigors of adverse climates, yet weather attractively.

Read More

Landscape Home
No Dig Garden
More Articles
Contact Us
Site Map

Block Paving

There are two laying methods commonly used. The most popular is termed 'flexible paving', indicating that the blocks or bricks are laid on a sand bed and the joints filled with a fine silica sand.